PROJECT BACKGROUND

 Scanning and modelling of the 10,000m² undercroft / delivery area for a large Mall. Including structural columns and beams showing apertures and all major pipes, ducts, cable trays and equipment along with bounding walls and floors. The purpose of the scan and model was to design a new route for the gas main checking there was no potential clashes with existing structure and MEP.

Working alongside DNV GL the gas main was designed in Revit to undulate around existing kit. This was then used by our visualisation team to develop an animation ultimately to be used on-site to construct the mains.